- Lead detailed review and validation of General Contractor (GC) baseline and update schedules.
- Perform DCMA-style schedule quality checks and enforce scheduling best practices (logic, constraints, float integrity, etc.).
- Actively participate in schedule review meetings with GCs and internal stakeholders; drive accountability and track action items.
- Conduct delay analysis and Time Impact Analysis (TIA), including forensic schedule reviews and prospective scenario modeling as required by the project team.
- Identify schedule risks, critical path impacts, and mitigation strategies across active projects.
- Develop executive-level summaries highlighting key risks, delays, and recovery plans.
- Interface with project management, construction, and commercial teams to align schedule with cost and scope changes.
- Support development of recovery schedules and acceleration strategies when required.
- Maintain schedule reporting dashboards and performance metrics (float trends, milestone tracking, etc.).
- Hands-on experience with Primavera P6, with a good understanding of concepts of float, critical path, and construction sequencing across civil, structural, and MEP scopes.
- Ability to conduct site “schedule” walks to validate construction progress against the updated schedules when requested by project teams to verify installed scope, percent complete, and alignment with reported progress.
- Experience performing delay analysis and/or Time Impact Analysis (TIA).
- Proven ability to lead schedule review meetings and challenge GC schedules.
- Ability to communicate complex schedule data clearly to internal and external stakeholders.
- Data center / mission-critical project experience.
- Experience with Oracle Primavera Cloud (OPC) or similar platforms.
- Background in Construction Management, Civil Engineering, or a related field.
- Exposure to cost/schedule integration or broader project controls functions.
- Must be able to walk, stand, stoop, twist, bend, and climb stairs or ladders for extended periods while navigating uneven, unpaved, or obstructed terrain.
- Must be able to lift, carry, push, or pull up to 50 pounds on an occasional basis.
- Must be able to drive between job sites and access all areas of an active construction zone, including raised platforms, scaffolding, and confined spaces.
- Must be able to tolerate exposure to outdoor weather conditions, dust, and construction-related noise, vibrations, and odors.
- Must be able to communicate effectively with contractors, engineers, and site personnel, and maintain situational awareness in high-activity environments.
- Personal protective equipment (PPE), including hard hats, safety vests, hearing protection, and steel-toe boots, is required.
- Must have sufficient visual acuity to read drawings, specifications, and safety signage, and to observe site activity.
Skills Required
- Hands-on experience with Primavera P6
- Understanding of float, critical path, and construction sequencing
- Experience performing delay analysis and Time Impact Analysis (TIA)
- Proven ability to lead schedule review meetings
- Ability to communicate complex schedule data clearly
What We Do
The fifth industrial revolution is here, and it runs on data centers and the skilled labor who build and sustain them. Behind every AI breakthrough, cloud platform, and digital connection is a data center, and behind every data center are the people who build, commission, and operate them. By bringing blue-collar jobs back to the front lines of innovation, Overwatch(SDVOSB) is proving that the future of technology depends on human expertise as much as it does on machines. Your mission-critical journey starts and scales with us. We deliver end-to-end solutions for the data center lifecycle, design, build, staffing, and sustainment, powered by a workforce you can trust.







