Soilmec North America

United States
Total Offices: 2
350 Total Employees
Year Founded: 1969

Teams at Soilmec North America

24 Days AgoSaved
Remote
United Arab Emirates
Industrial • Manufacturing
Implement and manage QA/QC procedures for piling and foundation works, review ITPs and quality documents, conduct inspections and testing, prepare reports and NCRs, coordinate with consultants, subcontractors, construction and HSE teams, and support audits and continuous improvement.
24 Days AgoSaved
In-Office or Remote
2 Locations
Industrial • Manufacturing
Design and analyze piling, shoring, and deep foundation systems (bored piles, CFA, micropiles, secant piles, diaphragm walls). Perform geotechnical and structural analyses, slope stability and soil improvement studies. Prepare calculations, reports, drawings (AutoCAD), and technical submissions. Coordinate with project stakeholders, support site execution, ensure compliance with UAE standards, and participate in value engineering.
24 Days AgoSaved
In-Office or Remote
2 Locations
Industrial • Manufacturing
Supervise daily piling, shoring, and foundation works ensuring compliance with drawings, specifications, and method statements. Coordinate with surveyors, QA/QC, HSE, subcontractors, and clients; monitor progress, productivity, and inspections; prepare daily reports, resolve technical issues, maintain documentation, and support project management to meet objectives.