Senior Regional Construction Scheduler

Posted 3 Days Ago
Be an Early Applicant
Los Angeles, CA, USA
In-Office
140K-159K Annually
Senior level
Professional Services • Real Estate
The Role
Senior Regional Construction Scheduler reviews and develops Primavera P6 construction schedules, analyzes critical paths, milestones, cost loading, delays, and time impacts, and prepares technical schedule reports. The role supervises project schedulers, coordinates with project managers and construction teams, interprets construction drawings and contracts, maintains program and master schedules, and visits construction sites as needed.
Summary Generated by Built In
About Vanir

Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and real estate development. Since 1964, we have consistently exceeded client expectations. Ranked as a top PMCM firm by Engineering News-Record (ENR) for more than three decades, our award-winning team provides a full range of services to public and private sector clients in the aviation; healthcare; education (K-12 and higher); justice and essential services; science and technology; state and local government; transportation; water and wastewater; energy; and commercial, residential and nonprofit markets.

Job Description

Essential Duties & Responsibilities:

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide variousschedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural,Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based onstructured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule reviewcomments that document milestone schedule slippage, critical path activity slippage, and provideover-all schedule analysis based on structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis whileincorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues orconcerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure dataintegrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthlyschedule progress.

Minimum Qualifications:

  • Graduation from a recognized college or university with a bachelor’s degree in constructionmanagement, engineering, architecture or any related field
    • OR Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties to compensate forthe required education.
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and scheduleforensics

Benefits

Vanir offers a comprehensive, competitive benefits package that includes 401(k) Savings with employer matching contributions, medical, dental, vision, health savings account (HSA) with employer contributions, life, AD&D and disability benefits, flexible spending account (FSA), voluntary benefits, Teladoc, pet insurance, paid time off, national employee assistance program (EAP) and employee referral program.

How to Apply

If you're interested in working for Vanir please visit our website to learn more and to apply online at www.vanir.com.

   

VEVRAA Federal Contractor

Request Priority Protected Veteran Referrals

EOE Minorities/Females/Protected Veterans/Disabled


Contact Email: [email protected]


Persons with medical limitations may, with reasonable accommodations, be capable of performing the duties of this position. Such a determination must be made on an individual basis considering the person's limitations, the requirements of the position, and the company's ability to make reasonable accommodations to the person's limitations.


We Participate in E-Verify


Pursuant to the Ban The Box Act/Fair Chance Initiative, we will consider for employment qualified applicants with arrest and conviction records.


#LI-JB1

Posted Salary RangeUSD $140,000.00 - USD $159,250.00 /Yr.

Skills Required

  • Bachelor’s degree in construction management, engineering, architecture, or a related field
  • Alternatively, a bachelor’s degree in any field plus four additional years of relevant experience
  • At least 10 years of full-time professional construction scheduling experience for an owner or general contractor
  • Proficiency in Primavera P6 v19 or the latest version
  • Proficiency in Microsoft Office Suite
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build effective working relationships with project teams and department staff
  • Understanding of cost engineering, scheduling, and schedule forensics principles and practices
  • Experience with educational facilities or public works projects
Am I A Good Fit?
beta
Get Personalized Job Insights.
Our AI-powered fit analysis compares your resume with a job listing so you know if your skills & experience align.

The Company
HQ: Sacramento, CA
476 Employees
Year Founded: 1964

What We Do

Vanir is a minority- and woman-owned national firm providing program, project, and construction management services, along with real estate development. Founded in 1964, it serves public- and private-sector clients across healthcare, justice and essential services, education, government, science and technology, transportation, water and wastewater, energy, and commercial, residential, and hospitality markets through offices in multiple states serving projects nationwide.

Similar Jobs

In-Office
Westlake Village, CA, USA
3050 Employees
128K-146K Annually

KDG Construction Consulting Logo KDG Construction Consulting

Senior Regional Construction Scheduler

Professional Services • Transportation • Consulting • Industrial
In-Office
Metropolitan, CA, USA
160K-185K Annually

The Greenridge Group, Inc. Logo The Greenridge Group, Inc.

Senior Regional Construction Scheduler

Professional Services • Consulting • Industrial
In-Office
Los Angeles, CA, USA
100K-200K Annually

Tapestry - Coach and Kate Spade Logo Tapestry - Coach and Kate Spade

Temporary Associate

eCommerce • Fashion • Retail • Sales • Wearables • Design
Hybrid
Ontario, CA, USA
16000 Employees
15-24 Hourly

Similar Companies Hiring

Fora Thumbnail
Agency • On-Demand • Professional Services • Sales • Software • Travel • Hospitality
New York, NY
250 Employees
Energy CX Thumbnail
Greentech • Professional Services • Business Intelligence • Consulting • Energy • Financial Services • Utilities
Chicago, IL
150 Employees
RentSpree Thumbnail
Software • Real Estate
Seattle, WA
126 Employees

Sign up now Access later

Create Free Account

Please log in or sign up to report this job.

Create Free Account