Company Description
Assystem STUP employs 1500 engineers who provide support to clients in the transportation, urban development, decarbonised energy, and industrial and complex buildings markets. With its headquarters in Delhi, Assystem STUP also has a local presence throughout India with 9 offices spread across the country. Assystem STUP’s teams have already been involved in many projects such as the construction of Dassault factories in Nagpur, preliminary studies of future EPR nuclear reactors in India, the development of the road transport networks in Mumbai, and others.
Job Description
For the sack of a clear distinction between the two scopes, the task types are strictly divided into
2 categories: tasks specific to EWP(Engineering Work Package) anticipation (EA) and tasks specific to TOP(Turn Over Package) anticipation
Check a Technical drawing or diagram together with the associated BoM and 3D
Check technical document using IO requirements and industrial best practices (e.g. validation of standard representation of information, and/or technical aspect and/or project quality related)
Check the overall technical document input of EWP production
Check the overall drawing or diagram or BoM quality, and consistency with specific rules applicable for the TD type and EWP requirements (ISO standards & CAD manual & and ITER plant General plans & discipline dedicated drawings.
TOP CAD deliverables performance analysis, Weekly provide performance analysis and status of TOP CAD deliverables, Monthly detailed activity report Yearly global report
2D-3D Review related to Manufacturing, Assembly & Installation for a given EWP
o Provide industrial expertise to TRO or DO management in the frame of mechanical design, plant design, construction and operation, Produce dedicated EWP Documentation, Defining and documenting Process and Methodology dedicated to address specific EWP problematics
Preparation and support for Initial Report (deliverable) for a given EWP
Preparation and support for Progress Report (deliverable) for a given EWP
Preparation and support for Final Report (deliverable) for a given EWP
Preparation and support for Produce dedicated TOP Documentation
Input Engineering Data applicability and completeness control
To perform the control of the available of engineering data to be used as input for
the production of CAD data dedicated to Operation,
Corrective Actions for Input Engineering Data Completion Support the correction of the discrepancies reported by a TA2 activity
Control of Operation CAD Data production outputs
Control after their approval process that the CAD data produced specifically for
Operation purposes - meaning the CAD documents and their associated BOMs,
including the mandatory properties of the listed equipment
Review of the on-site red-marks session reports
I. To review and assess the completeness and usability by the designers of the redmarks
and annotation performed during site-visits
II. To request additional information and details to the site visit RO when necessary
for the designer to be able to produce the corresponding update of the annotated
CAD documents
Qualifications
Required Skill: Aveva E3D, Aveva Engineering, Aveva Diagram
Project: ITER France (L3 Offshore)
Sector: Nuclear Energy
Minimum Experience: 5 years
Additional Information
We are committed to equal treatment of candidates and promote, as well as foster all forms of diversity within our company. We believe that bringing together people with different backgrounds and perspectives is essential for creating innovative and impactful solutions. Skills, talent, and our people’s ability to dare are the only things that matter !. Bring your unique contributions and help us shape the future.
Top Skills
What We Do
Assystem, one of the world's leading independent nuclear engineering companies, is committed to accelerating the energy transition. We see ourselves as an activist in the development of nuclear energy, convinced that it is an essential part of the fight against climate change. 7,000 switchers, spread in 12 countries in Europe, Asia, Africa and the Middle East are working every day to make the energy switch by accelerating the development of nuclear and renewable energies, power grids, clean hydrogen projects and low-carbon transport. We design and supervise major projects through our engineering activities and accelerate our customers' digital transformation. We also develop new solutions to build faster and improve the performance of complex infrastructures. 55 years of experience have made Assystem a key partner of the world's largest industrial groups: CEA, EDF, ENEC, Enedis, Engie, Framatome, ITER, K.A. CARE, Naval Group, NICDC, Orano, RATP, Rolls Royce, Royal Commission, Sellafield, SGP, SNCF... Assystem is ranked in the Top 3 companies in the nuclear energy sector.